Parameters

• Temperature up to 120°С

• Production casing diameter 102 – 178 mm

• Pressure up to 1000 atm

• Volume of proppant pumping per 1 run:

– Up to 200 tons for EC 102, 114 mm

– Up to 400 tons for EC from 146 mm

Cup2Cup
Innovative technology for selective hydraulic fracturing / bottomhole zone treatment / multifrac in 1 well operation

Advantages of the technology Cup2Cup

  1. TreatmentUp to 10 intervals of bottomhole zone treatment and hydraulic fracturing per well operation

  2. Possibility to flush tubing elevator
    after "STOP" mode by pumping technical fluid through annular space by hydraulic fracturing fleet

  3. Significant reduction in well commissioning time due to well workover and coil tubing optimization

  4. Does not require the involvement of a coiled-tubing complex for bottomhole recovery

Selective well layout Cup2Cup
Cup2Cup Learn more

Implemented projects

Application of Clean Well technology (well bottomhole normalization after hydraulic fracturing) at Rosneft facilities in Khanty-Mansiysky Okrug

Learn more

Project PitMSFrac, Bashkortostan

Learn more

Development of wells with a jet pump during geological exploration in the Yamalo-Nenets Autonomous District

Learn more

Project “PEV – Online”, Irkutsk region

Learn more

Do you need a consult?

Write your question and our specialists will contact you within one business day.

Talk to an expert