Well development during hydraulic fracturing

Jet Pro Frac - jet pump for well development after hydraulic fracturing

Specifications

• Proppant pumping volume up to 300 tons per 1 well operation

• Productivity up to 250 m3 per day

• Fracture pressure during hydraulic fracturing up to 700 atm

• 84 hours time to failure in maximum mode

Technological process per 1 well operation

• Layout descent

• Hydraulic fracturing

• Bottomhole normalization

• Well development with hydraulic fracturing fluid extraction

• Layout lifting

Advantages of the technology

  1. Hydraulic fracturing and well development per well operation

  2. Reduction of time required to put a well into operation

  3. Cleaning the well or fracture from reaction products after chemical exposure

  4. Cleaning the hydraulic fracturing fracture from residual gel and increasing well productivity up to 25%

Well development equipment during hydraulic fracturing
Jet Pro Frac Learn more

Implemented projects

Application of Clean Well technology (well bottomhole normalization after hydraulic fracturing) at Rosneft facilities in Khanty-Mansiysky Okrug

Learn more

Project PitMSFrac, Bashkortostan

Learn more

Development of wells with a jet pump during geological exploration in the Yamalo-Nenets Autonomous District

Learn more

Project “PEV – Online”, Irkutsk region

Learn more

Do you need a consult?

Write your question and our specialists will contact you within one business day.

Talk to an expert