Project “PEV – Online”, Irkutsk region

More than 30 highly qualified employees
8 fchemical field laboratories
101 test sites
26 wells
Verkhnechonskoye oil and gas condensate field

 


Problem:

The Pressure Equalizing Valve (PEV) recording when operating on a jet pump is performed by a self-contained thermomanometer installed in the jet pump insert. The quality of the PEV recording is evaluated after removing the insert with the gauge.

Solution:

A new “PEV – Online” insert was developed, allowing a complex geophysical instrument to be lowered to the bottomhole for more accurate timing and recording quality.

Result:

Reduction of time costs for recording PEV, possibility to adjust the duration of the study in real time (increasing/reducing the recording).

Implemented projects

Application of Clean Well technology (well bottomhole normalization after hydraulic fracturing) at Rosneft facilities in Khanty-Mansiysky Okrug

Learn more

Project PitMSFrac, Bashkortostan

Learn more

Development of wells with a jet pump during geological exploration in the Yamalo-Nenets Autonomous District

Learn more